• Home
  • >
  • Blog
  • >
  • Modern Multi-Floor CAT A Fit-Out – Alfred Place, London

Modern Multi-Floor CAT A Fit-Out – Alfred Place, London

0 comments

The Challenge

35 Alfred Place required a full mechanical CAT A fit-out to transform the building into modern, lettable office space across six floors. The brief involved:

  • Installing a brand-new HVAC system that complements the building’s open, industrial aesthetic
  • Providing independent heating and cooling control per floor
  • Ensuring efficient ventilation and extraction for office and toilet areas
  • Delivering modernised public health systems throughout
  • Meeting BREEAM Very Good sustainability standards

The Solution

BMS Ltd carried out a full building upgrade that included:

  • Installation of a Daikin VRV III system with individual systems per floor, using exposed internal cassette units for an industrial finish
  • Construction of external gantries to support condensers from floors 1 to 4
  • Centralised controls per floor, allowing time schedule and setpoint management
  • A standalone ducted HVAC system for front-of-house
  • New centralised ventilation with a dedicated air handling unit on a purpose-built platform
  • Installation of toilet extract systems via a central twin fan unit
  • Full public health system upgrades including mains-fed booster sets, water heaters, and drainage realignment
  • All works completed to BREEAM Very Good standard for sustainability and efficiency

The Results

The project resulted in a modern, tenant-ready office space with:

  • Independent floor-by-floor climate control and energy-efficient HVAC
  • Visually integrated services with a stylish, industrial aesthetic
  • Improved air quality through centralised fresh air and extract systems
  • Reliable water and drainage systems throughout all facilities
  • Compliance with BREEAM Very Good sustainability criteria